Interlock in Stratford
Before pricing an extra parking space in Stratford, measure how wide your lot is at the street. For a rear patio, measure how wide the side-yard route is from the driveway to the work area.
Driveway and street approvals
Stratford requires a driveway alteration permit for a new or modified driveway, including a widening. In residential zones, the City caps the driveway at half the lot frontage or 8 metres, whichever is less. A driveway leading to a parking area may have a tighter limit within a required yard. Show the driveway and parking widths, lot frontage and sidewalk on the application drawing so staff can check the layout. [Stratford driveway permits](https://www.stratford.ca/inside-city-hall/by-laws/municipal-by-law-enforcement/) · [Stratford driveway permit package](https://media-003-ca.cdn.govstack.com/stratford-ca/media/lrdp1q5k/driveway-permit-application-form-2026-aoda.pdf)
If the crew needs to stage a bin or equipment on the City's sidewalk, boulevard or road, Stratford requires a Street Permit. Digging or cutting a sidewalk panel in the City right-of-way requires Municipal Consent. For a driveway or patio on a designated property or within the Heritage Conservation District, ask Planning whether the proposed alteration needs a heritage permit. Near the Avon River, check the conservation authority’s map before excavating or changing grades. [Stratford Engineering permits](https://www.stratford.ca/live-here/infrastructure-services/engineering/) · [Stratford Planning and heritage permits](https://www.stratford.ca/live-here/building-and-planning-services/planning/) · [Upper Thames regulated area maps](https://thamesriver.on.ca/planning-permits-maps/regulated-area-maps/)
Fit the paving to the lot
A narrow frontage can limit how much parking you can add. Behind the house, a tight gate or shared drive can restrict the size of the equipment and where the crew can stage aggregate. If the property has an approved grading plan, have the contractor use it to identify shallow channels that carry runoff between yards. On a low or slow-draining lot, ask the installer to check whether the soil is firm enough for the proposed base.
Plan for work from late spring into fall, once the soil can be excavated and compacted. Walk the lot after a spring rain to spot water backing up near the patio door or pooling along the existing paving. Agree on what will pause the job if the site stays wet or an early freeze arrives.
Compare written quotes
A rear patio reached only with small equipment can take more labour to excavate and haul out. An altered driveway can add costs for street permits, sidewalk work or reinstating the boulevard. Ask each contractor:
- What driveway and parking widths are in the drawing, and who obtains the approvals?
- Where will you stage the bin and stone, and how will you get equipment into the yard?
- What compacted base and edge restraints are included, and how will you keep the existing drainage route open?
- What do removal, disposal and restoration cost, and how will you price extra excavation if you find soft ground?
- What does the written warranty cover if water pools or pavers shift?